IslingtonTribune

The independent London newspaper

Sewer blockages don’t arrive overnight

26 April, 2019

Concrete in sewer under Hall Street, Islington, will take two months to remove

• TO hear Thames Water suddenly found a 105-ton blockage is not very credible, (Concrete blockage in sewer, News online, April 19).

These sewers are inspected often and a build-up like this would take time. This was no “accident” and someone at Thames needs to explain why this was never discovered and controlled earlier.

LUKE DEACON
Address supplied

Categories

Share this story

Post a comment

,